Confirm system configuration
Check capacity, process, source water, target water quality, pretreatment, RO, sterilization, tank, pump, and control system.
Prepare documents and labels
Installation drawing, pipe interface marks, electrical information, consumables list, and maintenance notes help local teams install faster.
Check packing and shipment
Photos before shipment, protective wrapping, wooden packaging if required, and loading records build trust for overseas buyers.
Plan remote installation support
Agree how to communicate after the equipment arrives, including photos, video calls, and step-by-step troubleshooting.